Concrete answers
Do I need a permit for a driveway in Tyler, TX?
The short answer
It depends on the work. Driveway approaches and curb cuts at the street, and work in the public right-of-way, commonly need city approval, while work entirely on private property may not. Check with the City of Tyler before the project starts, and with your HOA if you have one.
What to check
- Whether the work touches the street, curb or sidewalk in the public right-of-way.
- Whether you are adding a new curb cut or widening an existing one.
- Any HOA rules on driveway size, materials or layout.
- Utilities: call 811 before digging so buried lines are marked.
Who to ask
The City of Tyler is the authority on permits inside the city. Rules can change, so confirm with the city directly for your address rather than relying on a general answer.
Planning around it
If approval is needed, build the time into your schedule. We can talk through what parts of your project are at the street when we look at the job.
This page is general information. Every slab and every yard is different, so the right answer for your concrete comes from looking at it in person.
Ready to talk about your concrete?
Let's get your project on solid ground.
Tell us what you need and we'll get back to you to talk it through and set up a time to look at the job.
Prefer to call?(903) 555-0100